viernes, 18 de marzo de 2011

CASSIDIAN's Fully automatic ram-air parachute system for the safe and pin-point delivery of sensitive loads receives operational certification



CASSIDIAN's ram-air cargo parachute system ParaLander receives operational certification: The ParaLander ram-air cargo parachute system, developed and produced by Cassidian, has been approved for operational deployment by the Bundeswehr Technical Centre (WTD) 61 in cooperation with Cassidian in Manching. ParaLander was classified as an unmanned aerial vehicle (UAV) following extensive flight testing, and is the only commercially available system in the world that can ensure the pin-point delivery of sensitive mission equipment, humanitarian aid and supplies fully automatically from the air without damage (c) Cassidian


* Fully automatic ram-air parachute system for the safe and pin-point delivery of sensitive loads
* Provision of supplies for operational units in the crisis area
* Approved for deployment in restricted areas, including in peacekeeping flight operations


The ParaLander ram-air cargo parachute system, developed and produced by Cassidian, has been approved for operational deployment by the Bundeswehr Technical Centre (WTD) 61 in cooperation with Cassidian in Manching. ParaLander was classified as an unmanned aerial vehicle (UAV) following extensive flight testing, and is the only commercially available system in the world that can ensure the pin-point delivery of sensitive mission equipment, humanitarian aid and supplies fully automatically from the air without damage. To date the German Armed Forces have procured five ParaLander systems within the scope of immediate operational requirements; these are now to be deployed for missions in Afghanistan. The procurement of additional systems for the German Armed Forces is envisaged.

ParaLander has received Category I certification under UAV regulations and is therefore approved for deployment in restricted areas, including in peacekeeping flight operations. The system is initially intended to carry a 1,000 kg payload, dropped from a C-160 Transall transport aircraft. The medium-term goal is also to be able to deploy the ParaLander over populated areas during operations and from on board the A400M. Depending on the type of aircraft dropping it, the system can be used at altitudes of up to 10,000 metres and over distances of up to 50 kilometres. Cassidian is also working on making ParaLander able to carry payloads of more than five tonnes in the future. The system thus makes a significant contribution to supplying operational units that are cut off from supply routes in the crisis area. In addition, ParaLander improves safety for the aircrew of transport aircraft, as it can be dropped beyond the range of most air-defence systems in crisis regions.

ParaLander consists of a ram-air parachute and the control unit, which are lashed to the payload, and a mission planning system. After the parachute system has been dropped from the aircraft, the control unit steers it and its payload to the target area with the aid of servomotors and GPS. A patented mechanical system, activated by a laser altimeter, ensures that the load’s descent is slowed down in good time shortly before the landing.

EADS

jueves, 17 de marzo de 2011

Northrop Grumman, U.S. Navy Complete Second, Third Flights of X-47B Unmanned Combat Air System. Flight Envelope Expansion Begins

EDWARDS AIR FORCE BASE, Calif., March 17, 2011 (GLOBE NEWSWIRE) -- Less than a month after completing the first flight of the U.S. Navy's X-47B UCAS-Demonstration aircraft, flight test engineers from Northrop Grumman Corporation (NYSE:NOC) and the Navy have successfully completed the aircraft's second and third flights.

The flights, both conducted at Edwards Air Force Base, mark the beginning of a process called envelope expansion during which the test team will begin proving that the tailless aircraft can perform safely over a broad range of altitudes, air speeds and operating weights.

During the X-47B's 39-minute second flight on March 1, the aircraft flew to an altitude of 7,500 feet at speeds up to 200 knots. During its 41-minute third flight on March 4, the aircraft reached an altitude of 7,500 feet and a top speed of 180 knots. By comparison, the X-47B flew only to 5,000 feet at a top speed of 180 knots during its first flight Feb 4.

"Conducting two flights of a brand new type of aircraft within one week, and both within a month of first flight speaks not only to the robust design of the X-47B aircraft, but also to the dedication and engineering skills of the joint UCAS-D flight test team," said Janis Pamiljans, vice president for the Navy UCAS program for Northrop Grumman's Aerospace Systems sector. "These flights continue to add momentum to the team's march toward demonstrating in 2013 that we can safely operate this tailless, low-observable-relevant air system on a Navy aircraft carrier."

According to Phil Saunders, chief engineer for Northrop Grumman's Navy UCAS program, envelope expansion is designed to fully characterize the aircraft's flying qualities and prove that they match the system's performance requirements and the test team's predictions.

"Over the next few flights, we'll continue to expand the envelope in terms of air speed, altitude and operating weight range," he said. "By gradually ramping up the complexity of requirements, we will systematically prove that this air system can safely take off, fly and land in all anticipated flight environments."

Northrop Grumman and the Navy expect to complete the planned 49-flight envelope expansion program at Edwards Air Force Base before moving the first X-47B to Naval Air Station Patuxent River, Md., later this year, he added.

One of the most important measures of performance, Saunders explains, is aircraft stability. The X-47B, which relies on high-speed computers to manage its flight control surfaces, must be able to adjust quickly and automatically to unpredictable environmental conditions such as air turbulence or cross winds. The recent test flights included a series of maneuvers designed to measure the aircraft's ability to maintain a smooth, level flying state in the presence of such conditions.

The flight tests also confirmed that the X-47B's flush mounted air data system – a nod to its low-observable-relevant design – is accurately sensing and communicating the aircraft's air speed, a critical factor in takeoff and landing.

In addition, the flight tests gave the team the opportunity to validate the aircraft's engine performance; its command and control system, and its ability to fly at a constant angle of attack and a constant rate of descent while on final approach to landing, simulating what it will have to do to make successful landing on an aircraft carrier.

The Navy awarded the UCAS-D prime contract to Northrop Grumman in August 2007. The six-year contract calls for the development of two X-47B fighter-sized aircraft. The program will demonstrate the first-ever carrier launches and recoveries by a tailless, unmanned aircraft. Autonomous aerial refueling will also be performed after carrier integration and at-sea trials.

Northrop Grumman's UCAS-D industry team includes GKN Aerospace, Lockheed Martin, Pratt & Whitney, Eaton, GE, Hamilton Sundstrand, Dell, Honeywell, Goodrich, Moog, Wind River, Parker Aerospace and Rockwell Collins.

Lufthansa Supervisory Board approves purchase of 30 A320neo Family aircraft, and 777 as frigther

A320.

Fuel-efficient new aircraft will fit seamlessly into Lufthansa's fleet and strategy

16 March 2011 Press Release

Lufthansa's Supervisory Board has approved the acquisition of 30 Airbus A320neo Family aircraft worth approximately US$2.8 billion. The order comprises 25 A320neo and five A321neo aircraft. With this latest selection the Lufthansa Group, Airbus's biggest airline customer, will have acquired a combined total of 443 Airbus aircraft. The engine decision will be announced by the airline at a later date.

The A320neo incorporates new more efficient engines and large "Sharklet" wing tip devices, which together will deliver up to 15 percent in fuel savings. This will represent some 3,600 tonnes less CO2 per aircraft, per year. In addition, the A320neo will provide a double-digit reduction in NOx emissions and reduced engine noise, thus being a good neighbour at any airport where Lufthansa is operating the aircraft.

"We salute Lufthansa's decision for sustainable growth with our eco-efficient A320neo aircraft, which will fit seamlessly into its Airbus A320 fleet," said John Leahy, Airbus Chief Operating Officer, Customers. "Since its launch in December last year, the 'neo' has taken the market by storm and has already attracted more than 330 commitments – with more to come. This represents the fastest rate of sales for any commercial aircraft ever."

Today the Lufthansa Group is Airbus' biggest operator worldwide with around 339 Airbus aircraft currently in service. These include: 236 A320 Family; 33 A330s; 65 A340s; and five A380s delivered. In addition to this latest decision for 30 aircraft, the Lufthansa Group has an order backlog which includes 60 A320 Family aircraft, eight A330s, and 10 A380s.

The A320 Family (A318, A319, A320 and A321) is recognised as the benchmark single-aisle aircraft family. Almost 7,000 Airbus A320 Family aircraft have been ordered and over 4,500 delivered to more than 320 customers and operators worldwide. The A320neo will have over 95 percent airframe commonality with the existing models making it an easy fit into existing fleets while offering up to 500 nautical miles (950 kilometres) more range or two tonnes more payload. Engines offered on the A320neo are CFM International's LEAP-X and Pratt & Whitney's PurePower PW1100G.




777

SEATTLE, March 16, 2011 – Boeing (NYSE: BA) is delighted that Lufthansa has selected the 777 freighter to support its global air freight operations.

The 777 freighter is a highly fuel-efficient airplane with low-noise emissions, meeting QC2 noise standards. The long-range and high-capacity 777 freighter features the lowest trip cost of any large freighter and will provide superior economics to Lufthansa.



PR Airbus & Boeing


miércoles, 16 de marzo de 2011

The first Airbus Military A330 MRTT for the Royal Saudi Air Force (RSAF) has successfully completed its maiden flight lasting 4hr 15min.

The crew reported that the aircraft, its systems and two General Electric CF6 engines performed entirely satisfactorily.

Following the 15th March flight the aircraft now enters the final certification and qualification phase for this version of the A330 MRTT leading to contractual delivery later this year. The second RSAF aircraft is already in conversion at the company's Getafe site (close to Madrid, Spain) and the third will begin the process in mid-year.

Prior to this flight, five A330 MRTTs had already flown. Those include three for the Royal Australian Air Force (RAAF), and two for the UK Royal Air Force. Two of the aircraft are already technically complete and ready for delivery to the RAAF in Getafe, pending finalisation of contractual discussion.

The picture shows the first A330 MRTT for the RSAF landing at Getafe.

PR

Northrop Grumman Completes Structural Proof Testing of Second X-47B Aircraft

PALMDALE, Calif., March 14, 2011 (GLOBE NEWSWIRE) -- The U.S. Navy's second X-47B Unmanned Combat Air System (UCAS) will be able to withstand all of the structural stresses and strains associated with takeoff, flight and landing – including those uniquely linked with landing or taking off from the moving, pitching deck of an aircraft carrier. That's the conclusion of an analysis by a Navy/Northrop Grumman Corporation (NYSE:NOC) test team following a rigorous, five-week series of structural proof tests of the jet's airframe.

A photo showing the airframe in its dynamic proof test fixture is available at http://media.globenewswire.com/noc/mediagallery.html?pkgid=8867.

The tests on X-47B air vehicle 2 (AV-2), conducted at Northrop Grumman's X-47B assembly and test facility in Palmdale, were completed Jan. 24, one week ahead of schedule. Northrop Grumman is the Navy's prime contractor for the Unmanned Combat Air System – Demonstration (UCAS-D) program.

"The proof tests validate the structural design of the aircraft, and give us confidence that we can operate this plane safely and reliably in all anticipated carrier environments," said Janis Pamiljans, vice president of the Navy UCAS program for Northrop Grumman's Aerospace Systems sector. "In particular, we now know that AV-2 can handle the stresses, strains and dynamic loads associated with catapult launches and arrested landings on the carrier deck, and air-to-air refueling."

AV-2 is identical to the first X-47B UCAS demonstration aircraft (AV-1) – which successfully completed its historic 29-minute first flight at Edwards Air Force Base, Calif. on Feb. 4  – except that it will be equipped with aerial refueling equipment. Northrop Grumman plans to use AV-2 to demonstrate unmanned air-to-air refueling – using both the U.S. Air Force's boom/receptacle approach and the Navy's probe and drogue approach – in 2014 as part of a technology demonstration related to the current UCAS-D contract.

The proof testing performed on AV-2 simulated eight design conditions, such as a 3-G symmetrical pull up and a 2.4G rolling pullout; and five conditions expected to occur on the ground, including takeoff and landing, said Sarah Beaudin, Northrop Grumman's AV-2 manager.

One of the ground tests included pulling on the nose gear (to simulate a catapult launch) and the tail hook (to simulate an arrested landing on the carrier deck) at the same time to provide a special combined load case for test with the required margins. One of the flight conditions simulated the forces produced by turbulence that could occur during air-to-air refueling, a more demanding requirement than that used to proof test AV-1 in 2009.

"To perform the testing, we bonded pads to 200 points on the airframe surface, and then pushed and pulled on those pads using hydraulic jacks to simulate various static and dynamic load conditions," explained Beaudin. "By measuring the stresses and strains experienced by the airframe in this test environment, we'll also be able to measure and interpret more accurately the stresses and strains experienced during flight."

Proof testing is one of the last few tests that AV-2 will undergo in Palmdale before its transition later this spring to Edwards Air Force Base for more system tests, taxi tests and first flight. Before that move occurs, the test team plans to test and calibrate the aircraft's fuel system, and paint the aircraft.

Under a UCAS-D contract awarded in 2007, Northrop Grumman has designed, developed and produced two X-47B aircraft. In 2013, these aircraft will be used to demonstrate the first carrier-based launches and recoveries by an autonomous, strike-fighter sized unmanned aircraft. The UCAS-D program will also be used to mature relevant carrier landing and integration technologies, and to demonstrate autonomous aerial refueling by the X-47B aircraft.

PR

The First Flight of the 747-8 Intercontinental will occur on or after Sunday, March 20, 2011

Email from Boeing:

The First Flight of the 747-8 Intercontinental will occur on or after Sunday, March 20, 2011. Later this week we will be posting the actual time and date of the event. However, please periodically check the website or the Twitter feed as weather conditions and other factors can affect the date and time of First Flight.

Instructions for accessing the live webcast of the takeoff and landing will be available 24 hours before First Flight. It's important to remember there is still testing to be done, and we will only fly the airplane when it is ready.

Watch for new developments on First Flight as they become available at: http://www.newairplane.com/747/incredible

For First Flight event coverage, follow us on Twitter at: http://www.twitter.com/boeingairplanes/

Sincerely,
Boeing

martes, 15 de marzo de 2011

Sikorsky X2 Technology™ Demonstrator Wins Prestigious Robert J. Collier Trophy

STRATFORD, Connecticut - The Sikorsky Aircraft Corp. X2 Technology™ demonstrator team has been named the winner of the 2010 Robert J. Collier Trophy, awarded annually to recognize the greatest achievements in aeronautics or astronautics in America. It is the 100th Collier Trophy to be awarded since the inception of the prize. Sikorsky is a subsidiary of United Technologies Corp. (NYSE:UTX).

The award, considered to be the one of the greatest honors to be bestowed in the American aviation industry, recognizes achievements that improve the performance, efficiency, and safety of air or space vehicles, the value of which has been thoroughly demonstrated by actual use during the preceding year.

The recognition comes six months after the X2 Technology demonstrator successfully achieved a speed of 250 knots true air speed in level flight, setting an unofficial speed record for a helicopter and accomplishing the program’s ultimate speed milestone. The Collier Trophy will be formally presented at the Annual Collier Dinner to be held on May 5 at the Crystal Gateway Marriott in Arlington, Va.

“This is a tremendous honor that recognizes the hard work, dedication, skill and vision of many people,” said Sikorsky President Jeffrey P. Pino. “Sikorsky has a long and storied history of innovation, starting with the invention of the world’s first practical helicopter and continuing today with X2 Technology and the exciting new possibilities it opens for our company and our industry.”

Robert J. Collier was an aviator, humanitarian, and sportsman who commissioned the trophy that bears his name in 1910 with the intent to encourage the American aviation community to strive for excellence and achievement in aeronautic development, according to the National Aeronautic Association web site. Previous Collier Trophy winners comprise a veritable “Who’s Who” of aviation excellence including Orville Wright, Chuck Yeager, and the F-22 Raptor Team. Among the Collier committee members to interview Sikorsky X2 team members earlier this week about the demonstrator’s accomplishments was American astronaut Neil Armstrong.

“The entire Sikorsky Aircraft team is thrilled that the Collier Trophy committee has recognized the X2 Technology demonstrator for its game-changing technology, putting us in the highly respected company of some of the industry’s most prominent pioneers,” said Mark Miller, Sikorsky vice president of research & engineering. “This is a tremendous honor for the entire Sikorsky community, and we are proud to see the X2 Technology demonstrator earn its place in aviation history.”

“As the X2 Technology program transitions to its first application, we are confident that the X2™ design has a tremendous future and is scalable for a variety of rotorcraft sizes and applications. This recognition is warm acknowledgement of the great things that can be achieved when the spirit of innovation and dedication to the task are the foundation,” Miller added.

“The X2 Technology demonstrator program set out to accomplish four key performance objectives: low single pilot work load, low vibration, low acoustic signature, and speed – defined as cruise at 250 knots,” said Jim Kagdis, program manager for Sikorsky’s Advanced Programs. “There was a fifth key objective that remains a driving force to all that we do at Sikorsky: to preserve the legacy and pioneering spirit of our company founder, Igor Sikorsky, and to educate and inspire the next generation of engineers and aviation professionals. The Collier Trophy exemplifies this fifth objective, so it is hugely rewarding for the team to stand recognized for upholding the basic tenets on which Sikorsky Aircraft was founded. I am extremely proud of the team and our accomplishment.”

The X2 Technology demonstrator combines an integrated suite of technologies intended to advance the state-of-the-art, counter-rotating coaxial rotor helicopter. It is designed to demonstrate a helicopter can cruise comfortably at 250 knots while retaining such desirable attributes as excellent low speed handling, efficient hovering, and a seamless and simple transition to high speed.

Among the innovative technologies the X2 Technology demonstrator employs are:
Fly-by-wire flight controls
Counter-rotating rigid rotor blades
Hub drag reduction
Active vibration control
Integrated auxiliary propulsion system

As a “follow-on” to the successful X2 program, Sikorsky Aircraft is continuing development of the next-generation rotary wing technology by launching the S-97™ RAIDER™ program. Sikorsky and select suppliers will design, build, and fly two prototype light tactical helicopters. These prototype vehicles will enable the U.S. armed forces to experience, first hand, the advanced performance capabilities X2 Technology can provide.

Like the X2 Technology demonstrator, the S-97 RAIDER helicopter will feature twin coaxial counter-rotating main rotors and a pusher propeller. In addition to flying at nearly twice the speed of a conventional helicopter, the S-97 RAIDER prototype aircraft will incorporate other key performance parameters critical to combat operations — increased maneuverability, greater endurance, and the ability to operate at high altitudes.

The X2 Technology program began in 2005 when Sikorsky first committed resources and full funding for the program’s development. Key suppliers for the X2 Technology demonstrator are:
Eagle Aviation Technologies, LLC.: Main rotor blades, miscellaneous composite hardware
Goodrich Corporation: SmartProbe™ air data system and engineering support
Hamilton Sundstrand Corp.: Flight Control Computers, Active vibration control, engineering support
LHTEC (Light Helicopter Turbine Engine Company, a partnership between Rolls-Royce/Honeywell): Engines, engineering support
Moog, Inc.: Active vibration actuation, Consignment MU/EU components, engineering support
Rotating Composite Technologies, LLC: Pusher propeller

Over the past two years, Sikorsky’s X2 Technology demonstrator has received several accolades including the 2009 Popular Mechanics Breakthrough Innovator Award, a 2009 “Best of What’s New” award from Popular Science, and was named “One of 2009’s Best Inventions” by Time magazine. In January 2010, Aviation Week named it “One of the Top 10 Technologies to Watch,” and was a finalist in the 2010 Aviation Week Laureate Awards category of Aeronautics and Propulsion.

The X2 Technology demonstrator’s Collier Trophy award marks the second time a Sikorsky team has been awarded the esteemed trophy. In 2002, the S-92® helicopter and its program team won the award. The trophy recognized the S-92 helicopter team for designing, manufacturing, testing and introducing into service the S-92 helicopter, which raised “across-the-board” standards for rotary wing air travel.

Sikorsky Aircraft Corp., based in Stratford, Conn., is a world leader in helicopter design, manufacture, and service. United Technologies Corp., based in Hartford, Conn., provides a broad range of high-technology products and support services to the aerospace and building systems industries.

PR

International Aero Engines Launches SelectTwo™ Program (new engines for A320family)

International Aero Engines AG (IAE) has announced the launch of its next generation V2500 engine — V2500 SelectTwo™.

An upgrade option for the V2500 SelectOne™, SelectTwo is projected to provide 0.58% fuel burn savings compared to the V2500 SelectOne engine for a 500 nautical mile A320 mission. SelectTwo is comprised of a software upgrade for the Electronic Engine Control (EEC) as well as a new data entry plug (DEP).

"SelectTwo is the latest example of how IAE effectively strives for new methodologies that enhance value to our customers," explained Ian Aitken, IAE President & CEO. "We are fully committed to providing substantial support and continued investment in the V2500."

For a 10 aircraft Airbus A320 fleet flying 2300 flights per year, this upgrade equates to savings of $4.3M USD over 10 years at current fuel prices, and 14,800 tons of CO2. Additionally, V2500 SelectTwo remains compliant with the most stringent CAEP/6 NOx standards.

SelectTwo is now available as a Sales Order Option for V2500-A5 SelectOne engines. Entry into service is planned in 2013 after a rigorous validation testing and certification program. IAE is working with Airbus on a flight test that is to be completed this year.

With more than 190 customers in over 70 countries, the IAE V2500 attracts customers as the most cost effective engine on the A320 Family. It is available in seven different thrust settings, from 22,000 to 33,000lb, to power the Airbus A319, A320 and A321 family of aircraft as well as the Airbus Corporate Jetliner.

IAE is a global aero engine consortium whose shareholders are comprised of Pratt & Whitney (NYSE: UTX), Rolls-Royce (RR.L), Japanese Aero Engines Corporation and MTU Aero Engines.

PR

Northrop Grumman Launches Integrated Assembly Line. Automated Production Line Designed to Enhance Affordability, Quality, Efficiency

PALMDALE, Calif., March 14, 2011 (GLOBE NEWSWIRE) -- Northrop Grumman Corporation (NYSE:NOC) took a significant step in transitioning the F-35 Joint Strike Fighter to full-rate production with the March 1 start-up of the company's integrated assembly line (IAL) in Palmdale.

In a ceremony for employees, company officials cut the ribbon on the new IAL and began utilizing the line later in the day. Inspired by automation systems used by automakers, the IAL was designed and developed by Northrop Grumman, working with Detroit-based KUKA Systems Corporation's Aerospace Division, a commercial automation integrator.

"Starting the integrated assembly line is an important step, but it's just the first among several that will lead to a streamlined, efficient system that will help produce the most capable, most advanced multi-role fighter in the world," said Mark Tucker, vice president, F-35 program, Northrop Grumman Corporation. "The IAL will be the key factor in the future production of this aircraft."

The new IAL occupies a space near the current F-35 assembly line in Northrop Grumman's Palmdale Manufacturing Center and includes automatic assembly tool systems, transportation systems and manufacturing systems, all controlled centrally and wirelessly by a factory communications system. The company anticipates it will produce its first entire fuselage early in 2012. Until then, work will continue using both the IAL and existing line.

"Since the very beginning, Northrop Grumman's role in producing the world's most advanced fighter has included highly trained personnel and high-precision systems, and the IAL carries on this mission," said Tommy Tomlinson, sector vice president, production operations, Northrop Grumman Aerospace Systems sector.

Tomlinson also noted that 2011 marks the 25th anniversary of the start of operations at the Palmdale facility.

"We're beginning a new era of production, and it's fitting that it's taking place during such a milestone year for the Palmdale facility," Tomlinson said.

At its heart, the IAL is designed to drive new levels of efficiency into the manufacturing process, an endeavor that includes reducing process times, increasing precision and quality, and reducing the costs of production.

"Our industry partner and our military customer are striving now more than ever before to improve the overall affordability of our products and services, and the IAL represents a major step forward for us in this effort," said Duke Dufresne, sector vice president and general manager of the Strike and Surveillance Systems Division of Northrop Grumman's Aerospace Systems sector. "As innovative as this line is, and as game-changing as we predict it will be in the future when it's operating at full capacity, we'll still continue to look for ways to improve how we do things."

As a principal and founding member of the F-35 industry team led by Lockheed Martin, Northrop Grumman is responsible for the design and production of center fuselages for all three variants of F-35 aircraft: conventional takeoff and landing; short takeoff, vertical landing; and the carrier variant.

All F-35 center fuselages currently are being assembled in Palmdale. In addition to producing the F-35 center fuselage, Northrop Grumman also designed and produces the aircraft's radar and other key avionics including electro-optical and communications subsystems; develops mission systems and mission-planning software; leads the team's development of pilot and maintenance training system courseware; and manages the team's use, support and maintenance of low-observable technologies.

To date, Northrop Grumman has delivered 42 center fuselages. Final assembly of all F-35 jets is performed by Lockheed Martin in Fort Worth, Texas, a process that includes mating the center fuselage to an aft fuselage produced by BAE systems; and the forward fuselage, cockpit and wings produced by Lockheed Martin.

PR

Bell Helicopter AH-1Z Earns Navy Initial Operating Capability designation ahead of schedule

FORT WORTH, TEXAS (March 13, 2011) -  Bell Helicopter, a Textron Inc. (NYSE: TXT) company, announced today that the U.S. Marine Corps' newest attack helicopter, the AH-1Z Cobra, achieved Initial Operating Capability ahead of schedule in February.

"The AH-1Z is a magnificent machine and I am thrilled that the Zulu has now been designated ready for combat." said John L Garrison, president Bell Helicopter. "The partnership between Bell Helicopter and the Navy-Marine Corp team demonstrates that we are both fully committed to providing world class equipment for our warfighters."

The U.S. Marine Corps is replacing the two-bladed AH-1W with the AH-1Z, which features a new, four-bladed composite rotor system, performance-matched transmission, four-bladed tail rotor, two additional wing stores stations on larger stub wings, upgraded landing gear and a fully integrated glass cockpit. The AH-1Z will see a 120% increase mission radius with attack payload over the AH-1W.

As part of the H-1 Upgrade Program, the AH-1Z replaces the currently fielded AH-1W. The AH-1Z will serve a primary role in assault support, offensive air support and air reconnaissance. The Zulu will play a supporting role in anti-air warfare, electronic warfare, and control of aircraft and missiles.

"Getting the AH-1Z to IOC has been a huge achievement for the entire team," said Col. Harry Hewson, program manager for U.S. Marine Corps Light and Attack Helicopters. "Now we get to put the Zulu in the hands of the Marines and prove that it is indeed the most capable marinized attack helicopter in the world."

The H-1 Upgrade Program offers 84 percent commonality of major component parts between the AH-1Z and UH-1Y utility helicopters. This commonality reduces lifecycle and training costs and decreases the expeditionary logistics footprint for both aircraft.

The new Zulus feature 10,000 flight-hour airframes, a new four-bladed rotor system with semi-automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded landing gear, and pylon structural modifications. This will help the new Zulu to achieve a 39% increase in HOGE  useful load over its predecessor. The Zulu also incorporates modernized, fully integrated cockpits/avionics that will reduce operator work load while improving situational awareness while being able to carry 32% more fuel.

The AH-1Z is equipped with two General Electric T700-GE-401 series engines and greatly increased lift capability and stores capacity, giving it a significantly greater ordnance payload for future growth potential. The primary weapon system is the Hellfire missile. It is fully shipboard compatible, and capable of operating from prepared or unprepared landing sites, day or night.

"The expeditionary agility that the Yankee/Zulu package brings to the Marine Air/Ground Task Force is exactly what the Marine Corps needs as we continue to fight two wars and conduct numerous other engagements in every clime and place," Hewson said. "I am proud to be a part of the team that is making that happen."

Bell

Boeing 747-8 Intercontinental Completes Final Gauntlet Test

EVERETT, Wash., March 14, 2011 /PRNewswire/ -- Boeing (NYSE: BA) has completed final gauntlet testing on the first 747-8 Intercontinental jetliner. The two days of testing were completed late Sunday. "The team continues to do great work to get the 747-8 Intercontinental into the air," said Elizabeth Lund, vice president and general manager, 747 program. "It'll be a great day for the team when the airplane flies."

Gauntlet testing simulates flight conditions to test systems and ensure flight readiness. During the testing, Boeing test pilots put the airplane through its paces. See how extensive the testing is in this video: http://goo.gl/0cJCZ. Gauntlet testing is a crucial step in the path toward first flight.

First flight of the 747-8 Intercontinental will occur after final flight readiness reviews, receipt of documentation from the U.S. Federal Aviation Administration and taxi testing. Both taxi testing and first flight are subject to weather conditions.


Boeing

lunes, 14 de marzo de 2011

Pratt & Whitney to Provide PurePower(R) PW1100G Engines on Airbus A320neo Order for International Lease Finance Corporation (ILFC)

EAST HARTFORD, Conn., March 8, 2011 – Pratt & Whitney will provide power for up to 100 Airbus A320neo family aircraft ordered by International Lease Finance Corporation (ILFC) as part of a contract announced today. The agreement includes 120 firm PurePower PW1100G engines for 60 aircraft and options for up to 80 engines for the additional 40 aircraft with deliveries scheduled to begin in 2016.  Pratt & Whitney is a division of United Technologies Corp. (NYSE:UTX).

"We're pleased to partner with Pratt & Whitney to power our new Airbus A320neo family fleet," said Henri Courpron, ILFC chief executive officer. "We look forward to extending the benefits of this new engine technology, which will improve fuel efficiency and address other environmental advantages for our customers."

Each ILFC Airbus A320neo family aircraft as part of this agreement will be powered by two PurePower PW1100G engines with benefits including double-digit reductions in fuel burn, environmental emissions, engine noise and operating costs when compared with today's engines.

"We congratulate Pratt & Whitney for this first selection of their new PurePower PW1100G engine for the A320neo," said Airbus Chief Operating Officer, Customers, John Leahy. "We look forward to mutually satisfying our customers with the world's most reliable and eco-efficient single–aisle aircraft family."

"Pratt & Whitney is delighted with this strong endorsement of the PurePower PW1100G engine," said Todd Kallman, Pratt & Whitney Commercial Engines & Global Services president. "We look forward to extending the PurePower engine's benefits to ILFC with this first engine selection for the A320neo family aircraft."

Pratt & Whitney has more than 800 PW1000G engines on order, including options. The PurePower engine uses an advanced gear system allowing the engine's fan to operate at a different speed than the low-pressure compressor and turbine. The combination of the gear system and an all-new advanced core delivers double-digit improvements in fuel efficiency and environmental emissions as well as a 50 percent reduction in noise.

ILFC is the international market leader in the leasing and re-marketing of commercial jet aircraft to airlines around the world. The people of ILFC have a strong commitment to aviation and its role in building relationships across the globe that drive innovation, prosperity, and understanding. ILFC owns a portfolio consisting of approximately 950 jet aircraft.

Pratt & Whitney is a world leader in the design, manufacture and service of aircraft engines, space propulsion systems and industrial gas turbines. United Technologies, based in Hartford, Conn., is a diversified company providing high technology products and services to the global aerospace and building industries.

P&W

Airbus Military celebra las II Jornadas de Ingeniería y Operaciones en el Centro Avanzado de Tecnologías Aeroespaciales de Sevilla

Airbus Military ha celebrado en el Centro Avanzado de Tecnologías Aeroespaciales de Sevilla sus II Jornadas de Ingeniería y Operaciones.
El encuentro ha congregado en este centro de la Fundación Andaluza para el Desarrollo Aeroespacial de la capital hispalense a las direcciones de Ingeniería y Tecnología y de Operaciones, con Miguel Ángel Morell y Alberto Gutiérrez al frente, así como a los ejecutivos de primer nivel de estos dos departamentos de la compañía.

Los 18 participantes han trabajado en diversos talleres y expuesto en común las conclusiones alcanzadas. Entre los objetivos sobre los que se ha trabajado en estas jornadas se encuentra el desarrollo de proyectos que se podrán implementar en el futuro, fundamentalmente en Andalucía, así como el fomento de las sinergias de dos departamentos que atienden requerimientos mutuamente.

Airbus Military


miércoles, 9 de marzo de 2011

Boeing Begins Final Assembly of 1st P-8A Poseidon Production Aircraft

RENTON, Wash., March 9, 2011 -- Boeing [NYSE: BA] today began final assembly of the first U.S. Navy P-8A Poseidon production aircraft in the company's Renton factory. The P-8A is the first of six low-rate initial production aircraft that Boeing is building as part of a $1.6 billion contract awarded by the Navy in January.

The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.

“Boeing will deliver this first aircraft to the Navy on schedule in 2012 in preparation for initial operational capability, which is planned for 2013,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “Our team has built seven P-8A test aircraft to date and the process improvements and efficiencies we’ve incorporated will continue to help reduce costs as the program moves forward.”

The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All aircraft modifications unique to the P-8A are made in sequence during fabrication and assembly.

The start of final assembly follows Spirit AeroSystems’ delivery of the P-8A fuselage to Boeing. The fuselage arrived via rail car on March 7 and was loaded into a tooling fixture. Boeing workers have begun installing systems, wires and other small parts.

“We’re excited to transition from the development airplanes to production,” said John Pricco, Boeing Commercial Airplanes P-8 program manager. “Our team’s tremendous work has put us in a good position as we ramp up to build both the P-8A for the United States and the P-8I for India.”

Boeing was awarded a System Development and Demonstration contract in 2004 to build and test six flight-test and two ground-test P-8A aircraft. The first three flight-test planes -- T1, T2 and T3 -- are completing testing at Naval Air Station Patuxent River, Md. The program’s static test plane, S1, completed its test program earlier this year.

A derivative of the Next-Generation 737-800, the Poseidon is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

PR

Airbus Military has given the green light to the industrial launch of the A400M airlifter and approved the start of series production.

New Head of A400M Programme appointed as industrial go-ahead reached


This follows a thorough review of all aspects of the programme which demonstrated that all readiness criteria were fulfilled. This means that the first four series aircraft will be produced in 2012 and the production rate will gradually be ramped up to 2.5 aircraft per month by the end of 2015.

“The industrial launch is a very important milstone for the programme. It is also excellent news for the suppliers and workforce who depend on the programme and who can now look forward to producing the A400M in the years ahead, said Airbus Military CEO Domingo Ureña.”

Having reached this key milestone, Rafael Tentor, who has led the programme for four years, is handing over responsibility to Cédric Gautier, currently President and Chief Executive of EADS Sogerma, who will, from 1st April 2011, lead the programme to certification, delivery and entry into service of the aircraft with the launch customers.

“My most sincere thanks go to Rafael for all the work he and his team have performed over the past years. His enormous commitment and dedication have enabled the A400M to become the aircraft it is today”, commented Domingo Ureña. “Rafael has led the programme back on track, to first flight and initial Flight Test. The industrial launch means a turning point. I am convinced that, with all his engineering and above all industrial expertise, Cédric will be the best person to manage this new phase leading to type certification, series production and entry into service”.

As of 1st April, Rafael Tentor (53) is becoming Head of Airbus Military aircraft programmes, covering the Light & Medium C212, CN235 and C295, as well as the A330 MRTT and all other conversions. He will replace Javier Matallanos (61) who will be assigned special projects by the Airbus Military CEO.

Following a graduation at the Ecole Centrale in Nantes (France) in 1985, Cédric Gautier (50) began his career in the Engineering Department with Aerospatiale Espace et Défense (now part of EADS-Astrium) where he moved up to head Les Mureaux production in 1997 for Aerospatiale Matra Lanceurs. In 1999 he was named Head of EADS-Astrium Integration and Production before being appointed Head of Industrial at EADS Sogerma Services in 2006, and subsequently being promoted to president and CEO of EADS Sogerma in 2007.

To-date, Airbus Military holds 174 orders for the A400M from eight customers. Civil Certification is due by year end, with first delivery to first customer/operator, the French Air Force, by the turn of the year 2012 / early 2013.

PR

From Stabilisation to Expansion: EADS Reports 2010 Full Year Results

Leiden,  09 marzo 2011

• All key indicators above guidance
• Order intake increased 81 percent to € 83.1 billion, driven by Airbus Commercial
• Revenues up 7 percent (€ 45.8 billion) with record deliveries of 510 commercial aircraft
• EBIT* before one-off: € 1.3 billion
• Free Cash Flow of € 2.7 billion, much stronger than expected
• Return to dividend, proposal of € 0.22 per share
• Net income: € 553 million (EPS € 0.68 per share)
• Record net cash position of € 11.9 billion
EADS' (stock exchange symbol: EAD) annual results of the Group's 10th anniversary year 2010 demonstrate significant achievements supported by the recovery of the macro-economic and commercial environment which was stronger than expected. Institutional markets including helicopters, defence and public budgets still have to be monitored as well as potential risks linked to oil and commodity prices, air traffic in North Africa and continued currency issues. In 2010, the order intake(4) amounted to € 83.1 billion, driven by improved momentum in commercial aviation. EADS' order book of more than € 448 billion provides a solid platform for future deliveries. Revenues reached a new high at € 45.8 billion. Likewise, profitability and cash performance were better than expected. The EBIT* before one-off of € 1.3 billion benefited from the better underlying performance than expected in Airbus legacy programmes and other core business activities. The reported EBIT* amounted to € 1.2 billion. The Net Cash position of € 11.9 billion is higher than anticipated, thanks to better cash management and higher order intake. It is a key asset to foster future growth.

"2010 was a year of significant progress for EADS. Commercial aircraft orders exceeded expectations and our cash flow generation was excellent. We took huge steps forward in managing and controlling key programmes: A400M has been substantially de-risked and A380 production is improving steadily", said Louis Gallois, CEO of EADS. "At the same time, we are paying the closest attention to the A350 programme, to the evolution of defence and space budgets and to the recovery of the helicopter market. After take-off into our second decade of operations, a key priority for us now is to further improve profitability in future years to lay a solid foundation for sustainable growth."

In 2010, EADS' revenues increased 7 percent to € 45.8 billion (FY 2009: € 42.8 billion) thanks to growth from both volume and mix effects across core businesses, reduced by a negative foreign exchange impact of around € 500 million. Physical deliveries remained at a high level with 510 aircraft at Airbus Commercial, 527 helicopters at Eurocopter and the 41st consecutive successful Ariane 5 launch. The percentage-of-completion methodology was resumed on the A400M programme based on the allocation of internal milestones. This has resulted in revenues of around € 1 billion being booked on the programme with zero margin due to the associated provision utilisation. The Customer Nations and EADS have concluded negotiations on the overall A400M discussions. Following the approval in France and Germany, negotiations on the export levy facility (ELF) scheme are to be finalised with some Customer Nations and are targeted for completion in 2011. In the meantime, the programme is delivering results with four development aircraft flying. The A400M maturity gate milestone was passed in February 2011, which clears the way for the start of series production. Civil certification is planned for 2011.

EBIT* before one-off (adjusted EBIT*) – an indicator capturing the underlying business margin by excluding non-recurring charges or profits caused by movements in provisions or foreign exchange impacts – stood at € 1.3 billion (FY 2009: € 2.2 billion) for EADS and at around € 280 million for Airbus. It benefited from good underlying performance in all core business activities in the Divisions, especially the Airbus legacy programmes. Compared to 2009, EBIT* before one-off was weighed down by the deterioration of hedge rates (FY2009: ~ € 1 = $ 1.26 versus FY2010: ~ € 1 = $ 1.35). As expected, A380 continues to weigh significantly on the EBIT* before one-off.

EADS' reported EBIT* stood at € 1,231 million (FY 2009: € -322 million).
In 2010, EADS has further refined its natural hedging strategy, impacting reported EBIT* and other financial result but with no impact on EBIT* before one-off and Net Income.

Net Income amounted to € 553 million (FY 2009: € -763 million), or earnings per share of € 0.68 (earnings per share FY 2009: € -0.94). The finance result amounts to € -371 million (FY 2009: € -592 million). The interest result of € -99 million (FY 2009: € -147 million) mainly reflects lower interest expenses. Meanwhile, the other financial result improved considerably by around € 170 million year-on-year to € -272 million (FY 2009: € -445 million) driven mainly by lower unwinding of discounted provisions in 2010 than in 2009. The unwinding of discount mainly decreases due to lower outstanding provisions.

Based on an Earnings per Share (EPS) of € 0.68, the EADS Board of Directors proposes payment on 6 June 2011 of a dividend of € 0.22 cents per share to the Annual General Meeting of shareholders (exceptionally, due to the significant loss incurred in 2009, no dividend payment was made that year). The record date should be 3 June 2011.

"We are pleased to resume paying a dividend to our loyal shareholders. The Group's performance in 2010 merits the proposed dividend. It is our clear ambition to gradually improve profitability in the mid-term. Profitability improvement is the key indicator for a better dividend distribution in the future," said Hans Peter Ring, CFO of EADS.

Self-financed Research & Development (R&D) expenses reached € 2,939 million (FY 2009: € 2,825 million), driven mainly by increases at Cassidian for the Unmanned Aerial Systems (UAS) and Systems businesses and at Eurocopter across the product range. At Airbus, the increase in R&D on the A350 XWB was compensated by decreases in other programmes, especially the A380 and A330-200F.
Free Cash Flow before customer financing of € 2,644 million (FY 2009: € 991 million) is significantly above expectations thanks to better operational and inventory management performance and stronger pre delivery payments at Airbus Commercial than expected. The improvement compared to last year is driven by the working capital. At Airbus Commercial, inventory reduction is driven by delivery patterns. The inflow of advances linked to Airbus commercial activity in 2010 was stronger than expected and was above 2009, particularly in the fourth quarter, reflecting the increase in future deliveries and commercial aircraft orders. This positive effect was more than offset by lower advance payments at Astrium and Cassidian compared to the 2009 level which was driven by exceptional order intake booked that year. Due to a combination of appetite from lessors and banking market recovery, customer financing generated a positive contribution of around € 60 million compared to a 2009 outflow of € 400 million. Investing activities consumed around € 2.3 billion, mainly as investment ramps up on the A350 XWB programme. Free Cash Flow after customer financing amounted to € 2,707 million (FY 2009: € 585 million).

EADS' Net Cash position amounted to € 11.9 billion (year-end 2009: € 9.8 billion) after a € 553 million contribution to pension fund assets.

It continues to be a solid foundation for the Group's operational needs as well as future growth.
The Group's order intake(4) of € 83.1 billion was significantly higher than one year ago (FY 2009: € 45.8 billion), driven by the higher level of commercial aircraft orders at Airbus. Net orders of 574 aircraft include 32 A380s and 78 A350 XWB. By the end of December 2010, EADS' order book(4) stood at a record € 448.5 billion (year-end 2009: € 389.1 billion), reflecting the improved commercial aircraft momentum. The Airbus Commercial order book also benefited from a positive revaluation impact of around € 25 billion due to the strengthening value of the U.S. dollar against the euro at the end of December 2010 compared to the end of December 2009. The defence order book stood at € 58.3 billion (year-end 2009:
€ 57.3 billion).

At the end of December 2010, EADS' workforce consisted of 121,691 employees (year-end 2009: 119,506).
Outlook

EADS' 2011 guidance is based on an assumption of € 1 = $ 1.35 for average and year-end closing spot rates.

In 2011, Airbus should deliver 520 to 530 commercial aircraft and its gross orders should be above its deliveries.

EADS' 2011 revenues should be above the 2010 revenues.

EADS expects 2011 EBIT* before one-off to remain stable compared to the 2010 level, at around € 1.3 billion. Increasing volume and price improvement at Airbus Commercial are roughly compensated by the deterioration of hedge rates, increasing R&D and less favourable mix of activities at Cassidian.
Going forward, the reported EBIT* and EPS performance of EADS will be dependent on the Group's ability to execute on the A400M, A380 and A350 XWB programmes, in line with the commitments made to its customers.

Reported EBIT* and EPS also depend on exchange rate fluctuations.

At € 1 = $ 1.35, EADS expects 2011 EPS to be above the 2010 level of € 0.68.

Free Cash Flow is expected to be positive. It is the most volatile item and EADS will give a more precise guidance later in the year.

In 2012, the Group expects a significant improvement in its EBIT* before one off thanks to higher volume, better pricing and improvement of A380 performance at Airbus.

* EADS uses EBIT pre goodwill impairment and exceptionals as a key indicator of its economic performance. The term "exceptionals" refers to such items as depreciation expenses of fair value adjustments relating to the EADS merger, the Airbus Combination and the formation of MBDA, as well as impairment charges thereon.
EADS is a global leader in aerospace, defence and related services. In 2010, the Group – comprising Airbus, Astrium, Cassidian and Eurocopter – generated revenues of € 45.8 billion and employed a workforce of nearly 122,000.




PR

Boeing 747-8 Intercontinental Completes Engine Runs Successfully

EVERETT, Wash., March 8, 2011 /PRNewswire/ -- Boeing (NYSE: BA) successfully completed the first engine runs for the 747-8 Intercontinental today. The milestone marks a key step in preparing Boeing's largest-ever passenger jet for flight test.

"The integrated airplane systems and engines performed as expected," said Elizabeth Lund, vice president and deputy program manager of the 747 program. "This result allows us to continue moving forward to first flight."

Engine runs began at 11:57 a.m. (PST) Tuesday and lasted approximately two hours and 45 minutes. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. The engine run test began with the Auxiliary Power System providing power to start the first of four GE GEnx-2B engines. The remaining three engines were started using the cross-bleed function.
Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

The GEnx-2B engine is optimized for the 747-8. The new engine contributes to a reduction in fuel burn, emissions and noise, which gives customers the lowest operating costs and best economics of any large passenger airplane while providing enhanced environmental performance.


PR

martes, 8 de marzo de 2011

ILFC selects 100 A320neo Family aircraft

The world’s premier aircraft leasing company, ILFC, has signed a Memorandum of Understanding for 100 A320neo Family aircraft, comprising 75 A320neo and 25 A321neo types. ILFC becomes the first customer for the A321neo, the largest member of the A320neo Family. In a separate agreement, Pratt & Whitney has been selected by ILFC to power at least 60 A320neo Family aircraft.

The A320neo incorporates new more efficient engines and large wing tip devices called, "Sharklets" which together deliver up to 15 percent in fuel savings. This represents some 3,600 tonnes less CO2 per aircraft, per year. In addition, the A320neo provides a double-digit reduction in NOx emissions and reduced engine noise.
In parallel with this order for the A320neo, ILFC will terminate its purchase agreement for ten A380s. “With 104 wide bodies on order and fewer than a dozen single aisles it makes perfect sense to rebalance our order book and position ILFC strategically on the fuel-efficient neo ,” said Henri Courpron, ILFC Chief Executive Officer.

“We are delighted to welcome ILFC as the first lessor to order the A320neo,” said John Leahy, Airbus Chief Operating Officer, Customers. “As an evolution of the highly successful A320, offering the latest in fuel saving technologies, the A320neo is a natural choice for ILFC. Indeed the A320 Family will continue to be a great asset for both lessors and airlines for the decades to come.”

“The A380 is a long term programme. Over the next twenty years we see a market of over 1,300 passenger aircraft in the very large aircraft segment. The A380 continues to win new customers and many are coming back with repeat orders.” Mr. Leahy added. “This year we’ve already won two new A380 customers and there are more queuing up.”

The A320 Family (A318, A319, A320 and A321) is recognised as the benchmark single-aisle aircraft family. Almost 7,000 Airbus A320 Family aircraft have been ordered and over 4,500 delivered to more than 320 customers and operators worldwide. The A320neo will have over 95 percent airframe commonality with the existing models making it an easy fit into existing fleets while offering up to 500 nautical miles (950 kilometres) more range or two tonnes more payload. Engines offered on the A320neo are CFM International’s LEAP-X and Pratt & Whitney’s PurePower PW1100G.

PR