sábado, 3 de enero de 2026

Ukraine’s 2026 Arsenal: Gripens, AWACS, Ballistic Missiles, and Europe’s Strongest Air Defense — UNITED24 Media

https://united24media.com/latest-news/this-is-why-russia-cant-afford-to-stall-talks-what-ukraine-is-getting-in-2026-14714


Ukraine could enter 2026 with its most dramatic military upgrade yet—combining Western fighter jets, airborne early warning aircraft, next-generation European air defense systems, and a new generation of Ukrainian-made ballistic and cruise missiles.

domingo, 28 de diciembre de 2025

El Baikal (reemplazo del An-2) ha volado con motor ruso

Trump Class Battleship Construction Won't Begin Until 2030s

Pentagon To Contract Fleet Of Seaplanes For The Pacific

Chinese Cargo Ship Packed Full Of Modular Missile Launchers Emerges

South Korea Starts KF-21 Pit Drop Trials with Air-to-Ground Weapons

Winter storm triggers widespread flight disruptions across U.S. Northeast

Christmas miracle in Nairobi: Brussels Airlines crew save choking infant

sábado, 27 de diciembre de 2025

Polish airports reopen after precautionary air defence alert triggered by Russian attacks on Ukraine

Chinese Fighter Jet Exports Set To Grow Significantly

Russia’s Baikal Aircraft Makes First Flight With indigenous VK-800 Engine | Tests Confirm Success

https://youtu.be/8pqbI6nEhCg?si=Ab6rbx0SQnUmJxjg


Russia has successfully completed the first flight of the LMS-901 "Baikal" light multipurpose aircraft powered by the new domestic VK-800 turboprop engine and AV-901 propeller. Conducted at the Ural Civil Aviation Plant airfield, the test confirmed stable flight, reliable engine performance, and proper functioning of all primary and backup systems.The Baikal reached speeds of up to 210 kilometers per hour and climbed to 400 meters during the sortie, marking the official start of joint flight testing. The aircraft is designed to replace aging An-2 and An-3 aircraft and serve remote regions with limited aviation infrastructure, including Siberia, the Far East, and the Arctic.The VK-800 engine fills a critical gap in Russia's aviation industry, enabling domestic production of light and regional aircraft previously dependent on foreign powerplants. Despite earlier media claims suggesting delays or program freezes, the flight took place exactly within the planned timeline. With certification expected in 2026, the Baikal program now moves into its most important testing phase.

Photos: Remembering 2025 in the Air Force and Space Force